Sunrise View Stormwater Bypass
Three alternatives were developed to resolve neighborhood flooding caused by off-site drainage and inadequate public and private stormwater infrastructure. PACE provided hydrologic/hydraulic analysis, preliminary drawings, and cost estimates for each alternative and led a public meeting. The preferred alternative was…
Read More