Kirkland Safe Routes to School

PACE provided survey and civil engineering design for improving walking routes at seven elementary school locations with missing sidewalk links. This was a Washington State Department of Transportation grant-funded project. Key elements included compliance with LAG Manual and WSDOT grant-funding…

Read More

Stephens Street/Chestnut Avenue New Signal Project

PACE completed a street and traffic improvement project for the city of Roseburg, which encompassed a comprehensive design to signalize the intersection of Stephens Street and Chestnut Avenue. PACE provided civil design and surveying, and acquired permits, land, and easements.…

Read More

Poplar Way Improvements

PACE provided surveying; PS&E; bidding assistance; construction management; and full-time, on-site surveillance for approximately 2,700 LF of roadway improvements on Poplar Way. This project included wingwall improvements and creek enhancement. Our design complied with STP-U funding requirements. Services CIVIL ENGINEERING…

Read More

Oakridge Stormwater Master Plan

PACE designed and implemented a stormwater plan to address the city’s infrastructure and regulatory issues, manage current and future runoff needs, and perform responsible long-term fiscal planning. Plan components included mapping existing and future drainage sub-basins, developing a CIP, creating…

Read More

Eatonville LID-Based Stormwater Management Plan

PACE assisted in developing a comprehensive stormwater management plan that is based entirely on BMPs and other LID techniques. Supporting codes and development standards were developed to require the use of LID for new development and redevelopment. A supporting stormwater…

Read More

Greater East Wenatchee Stormwater Utility

PACE developed the utility’s first stormwater management plan focusing on capital improvement project needs, solving water quality problems, and providing water quality retrofits. The projects complement the utility’s existing Programmatic Stormwater Management Program. The initial phase included transferring all city…

Read More

Sunrise View Stormwater Bypass

Three alternatives were developed to resolve neighborhood flooding caused by off-site drainage and inadequate public and private stormwater infrastructure. PACE provided hydrologic/hydraulic analysis, preliminary drawings, and cost estimates for each alternative and led a public meeting. The preferred alternative was…

Read More

Pump Station No. 25

The city of Shoreline's Pump Station No. 25 needed major upgrades to protect the adjacent properties and structures from flooding. PACE evaluated options to address the flooding, provided a complete topographic and boundary survey, and assisted with neighborhood outreach. The…

Read More

Kirkland Stormwater Decant Facility

PACE provided design for the construction of a Washington State Department of Ecology grant-funded stormwater decant facility to receive, process, and dispose of excavated materials and vactor truck waste generated by the city of Kirkland’s maintenance activities. The project converted…

Read More