The city of Shoreline’s Pump Station No. 25 needed major upgrades to protect the adjacent properties and structures from flooding. PACE evaluated options to address the flooding, provided a complete topographic and boundary survey, and assisted with neighborhood outreach. The city selected a completely new submersible pump station with telemetry and utilized the existing pond for infiltration for the lower storm events.