This comprehensive study examines causes and potential solutions for flooding at Ash Way and Maple Road. PACE provided a topographic survey, hydrologic/hydraulic modeling, solution alternatives, and construction costs for each alternative. Our analysis evaluated alternatives based on weighted criteria developed with the city, resulting in the preferred alternative.