PACE designed, analyzed, and developed the final plans for constructing 1.5 miles of Hylebos Creek, one mile of Surprise Lake Tributary, five new fish passage crossings, and approximately 190 acres of new floodplain, riparian area, and side channels and back channels. Our work included channel grading and the design and layout of habitat features. We used a large two-dimensional tidally influenced unsteady flow model to analyze complex construction phasing scenarios.

Services

CIVIL ENGINEERING

Client Name

Jacobs Engineering, Inc.

Location

Fife, WA

Features

  • Fish Passage
  • Stream Reconstruction
  • Hydraulic Modeling
  • Stormwater Management
  • Road Reconstruction
  • Water Resources
  • Utility Design
  • Permitting Support