PACE developed the Preliminary Hydraulic Design report and supporting analyses to replace a fish passage barrier at the I-90 crossing of Sunset Creek in Bellevue, WA. The team provided SRH-2D analysis, sediment mobility assessment, hydrology evaluation, conceptual large woody material (LWM) layout, and surveying. Now in the Design-Build phase, PACE is leading the stream and habitat design. The complex crossing runs beneath I-90 and two adjacent city roads. Notably, this is one of the first highway projects to propose using LWM within the crossing, enhancing habitat areas while addressing hydraulic challenges.

Services

CIVIL

SURVEYING

Client Name

Washington State Department of Transportation

Location

Bellevue, WA

Features

  • Design-Build
  • Fish Passage
  • Hydraulic Modeling
  • Preliminary Hydraulic Design Report
  • Stream Design