This system exceeded the U.S. Environmental Protection Agency’s and the state’s maximum contaminant level for arsenic and contained high levels of iron and manganese. PACE evaluated the system, including preparing a hydraulic analysis for fire flows, a reservoir storage analysis, and a water quality study including a pilot test to evaluate options for removal of the arsenic, iron, and manganese. PACE completed the civil design for the new 410,000-gallon steel reservoir, new pump station, and treatment facilities.

Services

CIVIL ENGINEERING

Client Name

Valley Water District

Location

Puyallup, WA

Features

  • Reservoir, Pump Station, & Treatment Facility Design
  • System Evaluation
  • Hydraulic Analysis for Fire Flows
  • Reservoir Storage Analysis
  • Water Quality Study
  • 3-Room CMU Building