PACE prepared the civil design to relocate and up-size the Olympus Lift Station to accommodate build-out flows within the service area. The project included a new custom-designed wet well/dry well station and the up-sizing of 2,500 LF of existing force main to 12 inches. PACE conducted hydraulic studies and models to simulate flow through the station.


Client Name

Coal Creek Utility District


Newcastle, WA


  • Lift Station Upgrade
  • Custom Wet Well/Dry Well Station
  • 12-inch Force Main
  • Hydraulic Studies & Models