PACE provided design and construction services for developing a new 313,096SF industrial water-bottling facility located on 18.93 acres of the Canyon Road Industrial Center. The facility features a high-speed manufacturing line; purification, filtration, and disinfection systems; production facilities; several shipping docks/loading bays; and expansive parking. The facility is designed to be operational 365 days a year, 24 hours a day for continuous production and distribution capabilities.

Our services included ALTA and topographic surveying services; easement preparation; design of 4.82 acres of parking, drive court, and loading dock space; design of domestic water and fire services, process water, sewer main, side sewers, and stormwater conveyance and treatment systems; and coordination of power service with Tacoma. This project was part of a 92-acre industrial plat designed and permitted by PACE. Challenges encountered during the project included completing the civil design ahead of the building shell, tenant improvement, and fit-up permit documents on a very rapid schedule. PACE had to work with consultant drawing packages that were in flux and had to react to rapid design changes.

Services

CIVIL ENGINEERING

SURVEYING

Client Name

Niagara Bottling, LLC

Location

Puyallup, WA

Features

  • ALTA & Topographic Surveying
  • Easement Preparation
  • Parking, Drive Court, & Loading Dock Design
  • Domestic Water & Fire Services
  • Process Water, Sewer Main, Side Sewers, & Stormwater Treatment & Conveyance Systems
  • Utility Coordination