PACE designed improvements to the Chennault Beach Drive drainage system. The improvements included installing new drainage pipes within the existing roadside ditches, relocating misplaced existing inlets, minor shoulder paving, asphalt curbing, re-establishing capacity to existing ditches, and assessing and replacing existing driveway culverts, if needed. Our scope included design, project management, topographic survey, public outreach, easement support, environmental permitting, plans, specifications, estimates, and bid support to improve the drainage system along Chennault Beach Drive between 60th Ave W and Marine View Drive. We also provided construction administration and inspection support for the project.

Services

CIVIL

            LAND SURVEYING

Client Name

City of Mukilteo

Location

Mukilteo, WA

Features

  • Drainage Improvements
  • Topographic Survey
  • Public Outreach
  • Permitting
  • Construction Inspections