I-405 Bellevue Braids

Washington State Department of Transportation built new multi-level braided ramps to separate vehicles entering and exiting northbound I-405 between NE 8th Street and SR 520 in Bellevue. The goal was to allow drivers to get to and from I-405 and…

Read More

I-90 Snowshed Replacement

Atkinson Construction proposed a Washington State Department of Transportation (WSDOT) Cost Reducing Incentive Process (CRIP) change order which resulted in a full redesign of three miles of highway widening, rock cuts, and replacing the snowshed covering the westbound lanes with…

Read More

Othello Station

The PACE team provided feasibility for a 3.4-acre transit-oriented development site near the Sound Transit Central Link Line. The analysis included developing a site layout, building layout, grading, and civil infrastructure design from an architectural hand-sketch. PACE staff interpreted zoning,…

Read More

Bellevue Water Main Replacement

The PACE team provided planning, coordination, and conceptual design of approximately 5,700 feet of water main replacement at 11 different sites associated with a city-wide AC pipe replacement program. City as-builts, WSDOT permits, assessor records, GIS data, and other sources…

Read More

Microsoft Building 83

PACE staff provided civil engineering design in support of a new building for the Microsoft Corporation on the former Safeco Campus located in Redmond, WA. The five-story building added over 270,000 SF of new office space with an associated four-story…

Read More

The Village at Alderwood Mall

This mall renovation and expansion project featured a new Nordstrom department store, a new 16-screen cinema, four new stand-alone restaurants, and a new urban village outdoor mall. Two multi-level parking garages and site modifications were completed to provide the required…

Read More

SR 503 Emergency Reconstruction

The March 2014 Oso landslide, containing 10 million cubic yards of mud and debris, covered one-mile of SR 530 with 20 feet of debris. It also cut off the community of Darrington for several months. Services provided included drainage design…

Read More

I-405/SR 167 Direct Connect

This project created a new flyover connection between the future HOT Lanes on I-405 and the HOT Lanes on SR 167 at one of the most heavily congested interchanges in the state. It included the design of a 195-LF, 14.7-foot…

Read More

Laurelcrest Development

The project consisted of the construction of 173 single-family residential lots over approximately 25 acres in unincorporated Snohomish County, near Bothell. The project included a central park area, preservation of interior and adjacent wetland systems, arterial frontage improvements, and connections…

Read More