This project developed an 80-foot-long geofabric wall to reconstruct a sloughing 12-foot-high bank that threatened private property. Stream enhancement included over 200 feet of stream reach to direct the channel away from the sloughing bank and enhance fish habitat. PACE provided surveying, feasibility, permitting, construction and bid documents, and construction inspection services.

Services

CIVIL ENGINEERING

SURVEYING

Client Name

City of Kirkland

Location

Kirkland, WA

Features

  • Stream Enhancements
  • Fish Habitat Enhancement
  • Restoration Plantings
  • SEPA & JARPA Permitting